![]() From the ethylene another 1.6 million tonnes annually of high-quality polyethylene and linear low-density polyethylene would be produced. ![]() The plant, if built, annually would produce 1.5 million tons of ethylene from ethane produced from the Marcellus and Utica Shale plays. It’s estimated the project would take roughly five years to construct. Kasich announced PTTGC America had selected a site in Belmont County for the possible construction of a world-scale petrochemical complex.Īs envisioned, the cracker complex would be located on the 500-acre site of a now-razed coal-fired power plant. The massive $5-$6 billion project was first made public in April 2015, when then-Ohio Gov. PTTGC reportedly has spent roughly $100 million on site preparation and engineering studies, with site preparation basically completed this past February. That review includes moving the FID on the Ohio cracker to sometime in 2021, Shale Directories learns. VV Petrochemical giant PTT Global Chemical (PTTGC) once again has postponed the final investment decision concerning its ethane cracker complex slated for southeast Ohio, this time until 2021.Ĭompany CEO Kongkrapan Intarajang said May 19, the company will review its short and long-term investment plans worldwide in response to the impact of the Covid-19 pandemic outbreak, the publication The Nation Thailand reported May 20. Latest facts and a rumor from the Marcellus, Utica, and Permian, Eagle Ford Plays
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |